Oral Preparation Workshop Cleanroom

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2019-05-29 01:47

  • Browse the number:

    467

Send an inquiries

Company Profile

Shenzhen Jielida Purification Equipment Co.,Ltd

By certification [File Integrity]

Contact:jielida(Mr.)  

Email:

Telephone:

Phone:

Area:Guangdong

Address:Guangdong

Website:http://www.gmpcleanroom.com/ http://jielida.chinaoutdo.com/

Product details

The design of the clean room purification project for oral preparation vehicles must first understand the use, use and production process characteristics of the clean room purification project. For example, the design of clean room purification engineering for integrated circuit production, first of all to understand the characteristics of the product - integration, shape size and production process characteristics;

Requirements for clean room purification of oral preparation vehicles - air cleanliness level, temperature and humidity and its control range, anti-vibration, anti-static and high-purity materials supply requirements; secondly, fully understand the production process that the owner intends to use, Process equipment and assumptions about the process layout. 



After that, the designer should work with the owner to determine the division of each functional area of the clean plant, determine the air cleanliness level and various control parameters of various production processes (rooms) - temperature, relative humidity, differential pressure, micro-vibration, high Purity and impurity content of pure substances;


Initially select the airflow pattern of the clean room purification project of the oral preparation vehicle and carry out the preliminary estimation of the purification air conditioning system and the comparison and determination of the design force case; carry out the layout and space arrangement of the clean plant, and must first arrange the product production area and The rational layout of the power utility area in the auxiliary area is usually in accordance with the production process sulfur process of the product. In the case of ensuring the production environment requirements of the product, it is beneficial to the operation and management of the product production, which is conducive to saving energy and reducing production. cost. The requirements for safe production, fire protection, environmental protection and occupational hygiene must be met in the layout of the oral clean room purification project.


In the plane layout of the oral clean room purification project, the flow of people and logistics should be fully considered. Try to be short and smooth. In the space design, the rational arrangement of various pipelines, logistics and transportation in the production process and clean room purification project should be considered. After determining the plane and space arrangement of the cleansing plant of the oral preparation vehicle, the design content, technical requirements and related issues that should be paid attention to in the design of the professional involved in the clean room purification engineering design of the oral preparation vehicle are proposed.


http://www.gmpcleanroom.com/